on 10-26-2010 6:32 AM
Dear Experts
Can you please help me to overcome from my following problem
1. I have created standard routing with 3 (10,20 and 30) operation
2. PP01,PP01 and PP04 control key assinged to all three operation Simultaneously
3. At last operation (30) i have introduced 10 Inspection Characteristic
4. If Qaulity test will be fail, want to select new operation 'Rework' automatically
Can i do through object dependecy ? How ?
B/R
Paresh Engineer
I am not sure about the Dynamically introducing the operation but there is concept of "Unplanned Char" introduction during the result recording.
You can explore this may be instead of operation you can put the unplanned char in the same operation if a char is rejected.
this is manual process
Just a suggestion
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.