PDS & PPM transfer ECC --> APO

Former Member
0 Kudos

Hello Experts,

when I try to create IM in ECC to transfer PDS or PPM for a specific product, no single PDS or PPM can be selected. I already transfered the products and plants in a separate IM easiyl but traying to transfer PDS for these products, no single record is slected.

Thank you for your help &

best regards

Aban

Accepted Solutions (0)

Answers (2)

Answers (2)

aparna_ranganathan
Active Contributor
0 Kudos

Aban

Try giving the material for which you want to transfer the PDS in the material fiter criteria

Thanks

Aparna

Former Member
0 Kudos

Hi Aparna,

thank you for your advice. I put the material in filter criteria and the outcome is: zero PDS was selction in CFM1 (the same for PPM even for different validity dates). Are there any preliminary steps needed before creating IM? These products are still active in the system and currently produced.

Regards

Aban

Former Member
0 Kudos

Hi,

Check whether PV is locked in ECC though PV is valid.

Thanks,

nandha

Former Member
0 Kudos

Nandha,

this was very helpful.

Thanks

Aban

Edited by: Abolfazl Hassanzadeh on Oct 22, 2010 2:06 PM

Former Member
0 Kudos

Hi

Request you to check for the validity of PV as on the date entered in the initial screen of the CFM1.

Thanks,

nandha