on 10-15-2010 11:46 AM
Hi all,
Is there any standard report in SAP which will give
1=> The time between the GRN and UD.
2=>The ratio of lots inspected & rejected for a period
The report input and output should show the inspection lot number. I tried with MCXA but it does not show the inspection lot number.
Thanks.
S J
1=> The time between the GRN and UD.
This is referred as the "Lead Time" in the reports-->MCXA , MCXC etc where you can get in the Lead Time.
2=>The ratio of lots inspected & rejected for a period
I am very sure that there is no report which will give you the inspection lot numbers.But the ratio can be seen without the lot number like material wise,vendor wise etc.
you may have to generate a report based on the QALS, QAMV, QAMR & QAVE etc tables
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
11 | |
10 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.