Dear All,

Please advice how to Pull a new plant in APO system from ECC. APO is already having some 28 plants. A new plant has just been created,& needs to be pulled into APO.

Also please advice,which all other Master data to be brought along with this.

Regards,

Vivek

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Query Resolved.

Former Member
0 Kudos

Hi

A plant is transferred to the SAP APO system with the location type 1001 (production plant). For this, all basic settings associated with the plant are transferred: Name, address, time zone, and regional assignment.

Additional data in the SAP APO location:

You can maintain the short text for SAP APO locations in several languages (in comparison to the plant in SAP R/3), so that the relevant short text appears when logging on in a particular language.

SAP APO locations generally contain a large number of additional planning parameters for which there is no equivalent in SAP R/3. You have to maintain these parameters in SAP APO, as you cannot transfer them from SAP R/3.

You can use CFM1 T-code and add this plant as selection and activate Inegration model which will bring the new plant to APO.

You can also find more information regarding the integration of ECC to APO using via CIF.

http://help.sap.com/saphelp_scm41/helpdata/en/9b/954d3baf755b67e10000000a114084/frameset.htm

Thanks