cancel
Showing results for 
Search instead for 
Did you mean: 

Same no for SRM PO and ECC PO

Former Member
0 Kudos

Hi all,

We are on SRM 5.0 ECS.

Is there anyway we can have the same doc number creatd for the SRM PO and R/3 PO.I can maintain the same number range for both but how do i ensure that the same no(say SRMpo --> 500000001 and ECC PO also 500000001) is assigned to both PO's?Is this possible?

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

You'd have to create the same number range (as SRM PO) for ECC PO that is coming from SRM and mark it "external". So the PO number would be in sync between the SRM POs and their ECC copies.

Former Member
0 Kudos

Thanks.

Is it possible to do the same thing for Confirmation in SRM and GR in ECC?

If so,what is the path in ECC to maintain the number range config for GR?

Former Member
0 Kudos

Is it possible to do the same thing for Confirmation in SRM and GR in ECC?

No. I don't believe so. ECC GR is considered "material document" as opposed to SRM GR which is still a procurement document.

Answers (1)

Answers (1)

Former Member
0 Kudos

SRM PO Number range internal = ECC PO number range external will do the job.

OMH6

Former Member
0 Kudos

Thanks KC.

Former Member
0 Kudos

H Experts,

Can someone confirm if we can have the same number forthe document for confirmation in SRM as well as GR in ECC although the same no raneg is maintained?