there is an insp plan. and a lot is created automatically with that insp plan and lot status is REL.

Now i have changed that insp plan i.e, added two more MICs in that plan. How can i re read that insp plan to the lot. is it possible.

Lot should be updated with the ammended insp plan

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member186399
Active Contributor
0 Kudos

Dear Siva

You can attach the new specification, if there has been no result recording or any activity confirmation done for the lot. Here is the steps for assigning the inspection plan again

1) Go to QA02 >Input the lot number

2) Menu > INspection lot > Reset Sample

3) Enter & Save

4) QA02

5) Inspection specification > Assign task list by click on Task/ specification

6) Go to Sample, do the SAmple calculation

7) Save

😎 Check whehter lot status is Rel

Regards

Gajesh

Former Member
0 Kudos

Go to qa02->Enter lot number->click on reset sample --->save the lot.

Now check the status of the lot ,it will be CRTD

Now change go to qa02>clcik on the inspection specification->click on the inspec spec--->New inspection plan will be selected -->save.Check the status it will be REL