cancel
Showing results for 
Search instead for 
Did you mean: 

SLOC determination for one material

Former Member
0 Kudos

Hi Gurus

I want SLOC to be determined in outb.delivery for one material only. How can it be configured?

Thanks.

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

hi Azat,

sloc is determined via transaction OVL3. There you have the field 'storage condition' which comes from material masterdata (MARA-RAUBE). Note that the field is editable at plant view, but the data is in MARA table (so general for the material code).

If you have different storage conditions defined for different materials, then you can configure only for selected ones automatic sloc determination.

However, can you explain why there is such a need? Because to me this is weird requirement..?

Regards,

Dominik Modrzejewski

Lakshmipathi
Active Contributor
0 Kudos

Have the item category as TAX or TAW for the other one so that without storage location and of course, with no stock, you can post the goods issue.

thanks

G. Lakshmipathi