on 10-08-2010 8:07 AM
Hello,
there are lot of possibilities to migrate a Webi report or a universe from Development server to Production server. my question for the experts is what is best practice scenario to do that. What should i take in consideration.
if i rename my Production universe, place it in an other Path and base my migration on the option "compare name and Path" of the universes. would it migrate ? What about the Connection ?
My Target when migrating Universes. Is only to migrate the universe without connections
But when migrating Webi Reports is to migrate only the reports without universes or connections. But at the same time be sure that the Report is adressed to the right universe in the Destination System.
Is that realistic .. Thanx ..
Hi,
If you are in BO XI 3.1 the best option is to use LCM, please reffer the product guide.
Regards,
Ramu.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
One can use :
1. LCM(Life Cycle Management)
2. Import Wizard
SAP BO introduced LCM specifically for migration of reports/universes etc between different environments. (DevTestQA--Prod) and at the same time one can use "Import Wizard" also.
And Import Wizard you can use for migration from older version to newer versions.
Per my experience, i used and using Import Wizard for migration between environments.
If you need further help on this, just let me know your mail, i'll share real-time migration doc which i prepared.
Thank You!!
Prerequest:
You should have Remote access to both the server the BO is installed
Approach1:
Login to source server
create a folder with the name temp.biar in the desktop of server 1
Go to import wizard of server 1
select server 1 as source and temp.biar file as a destination and import all that required to biar file
from server 1 connect to server 2 and place this biar file in some shared folder
connect to server2
open the shared folder and copy that biar file and place it in the desktop of server2
Go to import wizard of server 2
select the temp.biar file from desktop of server 2 and destination as server 2
and complete the process
Note: as we are doing this in remote, there will be lot of issues while connection to path which sometimes even the erro r message will mislead us....
Approach2:
dont create any biar file
Login to server 2
Go to import wizard
select server 1 as source and server 2 as destination and move directly from server to server
Approach2 is not preffered if server 2 is production serve....
this may help
Thanks,
-Ganesh
User | Count |
---|---|
76 | |
9 | |
8 | |
7 | |
6 | |
5 | |
5 | |
5 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.