on 10-05-2010 10:15 AM
Hi All,
Is it possible to record two Usage Decisions for the same Inspection Lot. Say for instance I GR material A for a qty of 100. This creates an Inspection Lot of a qty of 100 of which 50% can be approved while the remaining 50% is rejected.
How will it be possible to record the UD indicating that 50% is approved and 50% is rejected for the Inspection Lot that was created as result of the GR ?
Thanks in advance.
Regards,
Imran
Dear Imran
For these cases you have to configure UD codes in such a way that all these scenarios are addressed. There is no meaning in giving to UDs to the inspection lot. You have to penalise either the vendor or the production order for any rejections. You can also make use of Quality score in this regard
regards
Gajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Its not possible to give 2 UD for one lot.For this requirement, one more code need tobe created say "partially accepted" and can be used in such cases.
Vishal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
10 | |
10 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.