on 10-02-2010 1:28 PM
HI,
I am having one inspection lot with 08 insp type. It was generated only by stock transfer and by GR for prod order.
UD was given.
How i can cancel the UD and reverse the material documents ? so that i need to create a 04 insp lot for this same batch
Thanks
Dear if you want to reverse the UD then you have reverse the inspection lot which is not possible in standard SAP so you need to implement a SAP note to reverse the same refer sap note 175842 ',Inspection lot: Reversal of goods movements from UD,
Also refer note 33924.
Cheers
KK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
UD reversed with user exit
in MB31 the goods movement reversal done
then prod order confirmation done to create an inspection lot for 04 insp type
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Use note 175842.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please check our expert reply,about canceling UD and a material document after the quality.
Note:
Please search in SAP forum, before posting.
Thanks,
Sundaresan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.