Hi All,
Scenario:
Timesheet entried posted and released against Network Activity and its transferred to PS.
Then due to some reason these entries were cancelled (Deleted) again these are transferred to PS through CATA transaction code. But for Cancelled entris system does not shows - ve entried in CJI3 report. Due to which Actual Cost Line items sum comes up wrongly in CJI3 Transaction Code.
Could you please investigate and let me know?
Many thanks in advance.
Swapnil Kharul
1. Check the date range of CJI3 in the input screen, It should include both your confirmation and cancellation date.
2. If you want to transfer CATS entry to PS for confirmation of network activity, then use CAT5 instead if CATA. CATA should be used when you post time to WBSE.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Thanks for reply.
Actually I am entering correct Date range in CJI3 repor for field Posting date.
Also there is one Job Scheduled for CATA. I know CAT5 also doing same thing.
What may be the probable reason so that CJI3 is not showing negative value entry but CADO/CAT_DA is showing this entry as Cancelled.
Many thanks.
Swapnil Kharul
Hi,
Currently I am getting +ve value in CJI3 report, which means its showing doubled value.
Example:
Activity Type rate: 23/H
I have booked timesheet for 3 H and transferred to PS. Then in CJI3 its showing value as 69.
But timesheet entry then I have deleted from CAT2, and again trasferred to PS through Job run. Now it should appear as 69-
But still its not showing it as 69- and only 69 is appearing.
Also I noticed for that Confirmation number> Reversed Confirmation flag has not been set and that X falg row is not available in Confirmation Display screen against that Confimation number.
Then why its not appearing in CN30 or COFC Transaction Code?
I think due to some reason Confirmation Reversal is not happened, but then why the Log is not get generated?
Also I would like to know the probable reasons because of which Confirmation reversal not happened.
Many Thanks in advance.
Swapnil Kharul
Hi,
i think I got the scenario:
For CLSD NWA > Actual Posting can not be made which is Logically right. And this Network Complete Message also not appearing in CN30/COFC Log screen.
But I think there must be something to Prevent Network from CLSD if it carries some actual cost? Isn't it?
Also for every E message Type system should update CN30/COFC. Isn't it?
Please guide.
Many thanks.
Swapnil Kharul
I didnt see this reply posted on 4th Oct.
Prevent Network from CLSD if it carries some actual cost
Yes it is available. If the network activity is not fully confirmed or the cost is not settled and still balance available then system will not allow you to close it. But if you mark the activity as "not for settlement" then system will allow you to close the activity without settlement.
E message Type system should update CN30/COFC. Isn't it?
Yes, It should. Check your Actual cost check box in OPST.
Hi,
This thread has been closed.
Swapnil Kharul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.