cancel
Showing results for 
Search instead for 
Did you mean: 

Unable to do delivery

Former Member
0 Kudos

Dear All,

I have about 2000 Tons of a material in my stock.When I am trying to do delivery and pgi I am receiving an error msg."Only 0 EA of material MAT001 available

Message no. VL150"

This is happening whenever I am ussing down payment procedure and entering the billing plan.The stock is

unrestricted stock and availability check has been set to KP.

How to overcome this problem since enough stocks are available.

Regards.

Saurav

Edited by: Saurav1604 on Sep 25, 2010 10:41 AM

Accepted Solutions (1)

Accepted Solutions (1)

former_member187989
Active Contributor
0 Kudos

Compare material stock posting date in MB51 with delivery / pgi posting date.

If pgi date is back dated compared with stock posting date,then it will show above error message.

Answers (3)

Answers (3)

Former Member
0 Kudos

Resolved thanks.

Former Member
0 Kudos

Hi,

You can solve this by the TC: MMBE..........

also Check the safety stocks level,

If the safety stocks is greater than the ordered one, the system will not trigger delivery process,

Rds,

Jose

Former Member
0 Kudos

Thanks.It was resolved through MTO process.With Billing Plan Active - when I am trying to do PGI it was showing the following message

"Deficit of SALES Stock......."

The problem has been resolved.

Thanks

ajitsingh6
Active Contributor
0 Kudos

Dear,

Please check your stock in Tocode:MD04 whether Stock in available on given DATE in given PLANT

and STORAGE LOCATION.The issue is because of stock unavailability.

Regards

AJIT K SINGH