SCM 7 check the order (workplace)

Former Member
0 Kudos

Hello,

- We have final product with defined PPM (from R/3)

- operation are defined on workplace WP01

- system generate plan, convert production order

- information of the order are transfer by CIF to the R/3

- the people in the production has NOT time problem and must report production in R/3 on operation of the routing on different workplace; do change WP01 to WP02

- when we commit the change (in R/3), SCM check this change and do replace workplace WP02 to WP01

My question is :

Can we do some setting on SCM side to stop the SCM check ?

The customes can not create PPM for workplace WP02 or R/3 side.

Thanks for your answer

Ales.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

I donot know about SCM . But his can be restricted on R3 side by using the status profile.

1. Goto TCODE BS02

2. Create status profile ex A1

3. Assign the Object type Ex PP PRODUCTION ORDERS.

4. Goto User status.

5. Enter CRTD and set as initial.

6. Double click on CRTD.

7. Goto create mode

8. click change forbid and set the status to active.

9. Assign the user status to order type .

Now once production orders is created no change is allowed.

Refer below posting made by me in ECC " change not allowed for process order if the status is TECO.

.

Thanks,

nandha