on 09-20-2010 5:16 PM
Hi All,
I have an upgrade project ECC 5.0
Current state
Windows 32 O/S, ECC 5 32bits,Oracle 9.2 32bits .
Future State
Windows 64 O/S, ECC5 64bits, Oracle 9.2 64bits
-
My proposed plan
a. Offline backup the source system database
b. Use ORABRCOPY tool to generate the necessary oracle parameters
c. Install Windows 64bits
+d. Perform the SAP installation/Homogeneous copy.........
-
My Concern.
1) This system is part of the System Landscape i.e Dev,QAS and Prod; and we plan to do the upgrade in phases. What happens to the transport Domain. Is it possible to Transport from
ECC-Dev (64bits) to ECC-QAS(32bit) - ECC-PRD(32bits)
2) This system is also connected to an external 32bits 6.20 ITS. Will the connection still work i.e 64bits SAP ECC to 32bits External ITS based system.
Thanks for your help.
NF
What happen?... Absolutely nothing
1.) Yes
2.) Yes
Memory management is completely independentl between those instances
Regards
Juan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
24 | |
12 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.