Dear All

We are having 2 Purchase order for same Vendor for same material, inspection type used 01

and vendor has promised to supply us different specification of same material as per PO Terms.

now we want to assign task list with different specification to same vendor for same material as per PO no.

Plz suggest Procedure.

Accepted Solutions (0)

Answers (3)

Answers (3)

former_member796452
Active Participant
0 Kudos

closed

Former Member
0 Kudos

"Multiple specs " are used alternative to Inspection plan.

Ways could as suggested create two task list with different specs & dynamically assign the same after MIGO.

former_member42743
Active Contributor
0 Kudos

Can't be done by po. All you can do is create and assign two plans and manually assign the appropriate plan when the lot is created.

If the spec is different, these should be different materials.

FF

former_member42743
Active Contributor
0 Kudos

Also, I forgot, there is the user exit for assigning inspections plans which could be used. You'd have to figure out how each inspection plan is to be linked to the po. Some field would need to be used to hold the po number, such as in the description.

FF