Hi Gurus

I am struggling to determine how we will consume HU managed goods in production. The scenario is for the rework or repack of finished goods.

1) The HUs are staged to the production area (either PSA or ST 914 in WM) based on need for rework or based on a production order

2) Production Order is confirmed and the inventory on HUs is goods issued.

There are a few variations:

Ø In a rework the HUs are reused with a reduction; that is, they will send in 100 pallets to be reworked and get back say 90. In this case they would reuse the 90 HUs and the remaining 10 would be inactive.

Ø It is also possible that 100 HUs are staged to production and not all the inventory is consumed in the production order.

The basic question is:

How do we capture the actual HUs used in the production order or staged but not consumed in the production order?

Any kind of help will be highly appreciated,

Thanks

SK

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member1245242
Contributor
0 Kudos

Hi

Just want to understand the scenario... Is your sloc is maintained as HU sloc? how are you maintaining the stock, as HU? How r U doing components issue to production order?

If you r issuing all items as HU line items, then you can receive back the items after rework as HU managed during confirmation.

Rgds

Ram

Former Member
0 Kudos

Hi Ram

Yes the storage location is HU managed and integrated with WM as well.

Thanks

SK

Former Member
0 Kudos

Hi

below are the two basic scenario for which I am looking for solutions:

The clientu2019s product is glass packaging, essentially bottles (beer, wine, etc.). They are often shipped in cartons that are stacked on pallets.A FG(material number) is defined by the glass container plus the packaging configuration (including carton, stack height, etc.).

Scenario 1: Customer orders bottles in cartons in a 8 cartons high SKU, all SKUs in stock are the 10 cartons high SKU. A repack production order is created to take the 10-high pallets and repack them to 8-high. Sufficient 10-high pallets are staged to the PSA or 914 based on the TR. It is possible that the product on all the HUs or a portion of the HUs are consumed to make the new SKU. In the later, where not all the SKUs staged are used in production, how do we identify the HUs consumed in the production order and/or those left behind.

Scenario 2: If finished product needs to be reworked, the process would be like the above, except the product on HUs may be consumed in an open production order. In the case of rework, the goods would most likely be manually staged.