on 09-16-2010 2:54 PM
Hi,
Am able to login in to PRD system.but,am geeting the following error when am trying to log in to DEV system .The error is "Timeout while pending for route completion".
can any one help me in this regard
Thanks
That means the system was not reachable... are you connecting remotely?.. can you ping the host?
Not enough information here
Regards
Juan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Juan,
Am not able to connect remotely.but ,am able to connect to other systems in landscape.
AM GEETING THE FOLLOWING ERROR
Logon balancing error 88: Cannot connect to message server (rc=9) AND When i saw the detailed information ...am getting
Additional error information:
ERROR: timeout while pending for route completion
COMPONENT: NI (network interface)
RETURN CODE: -12
Thanks
Hi Keerthi,
Check the logon group in the SAP gui, the group might be changed.
Try login by changing the logon group to central Instance host name.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Keerthi,
This is a network issue. Are you able to ping to the IP or hostname of your message server.
Regards,
Sanujit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.