SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Simulate during billing

Former Member
0 Kudos

Hi,

In our schema we need to simulate a specific rate to obtain the final amount. We can´t check "not relevant to posting" in the schema step because we are using gross prices.

Is there any way to simulate the calculation ? We don´t need the quantity but the amount (QUANTI01)

Thanks a lot.

Manuel

1 REPLY 1

former_member442034
Active Participant
0 Kudos

Hi,

You can create the specific rate with the steps with the calculation of the summarization of the relevant amounts (brutto) with some COMPUTE* variant programs.

Or you can create Z* Variant program for the creation of the line with the summarization of the posting relevant lines.

Vlado

Edited by: Vlado Belis on Sep 15, 2010 7:55 PM

Edited by: Vlado Belis on Sep 16, 2010 10:01 AM