User exit for the PS-SD integration (WBS popup at the time of SAVE in VA01)

BalajiD
Explorer
0 Kudos

Dear all,

At the time of saving a sales document in VA01, there is a popup with the standard project and the WBS element structure. This comes from the standard PS-SD integration.

My requirement is just before the popup, I need to validate and change the WBS elements. Is there any user exit for handling this scenario?

Thanks in advance,

Balaji

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Balaji,

As Nitin says, once you can check the SD forum.

vemula

nitin_patoliya
Active Contributor
0 Kudos

I don't think is there any exit of PS you can use here.But you should use BAPI for sales order save. However for categroing similar kind of requirement we have used custom validation for combination of plan and network parameters validating with table.

Check with SD forum as well.

WIth Regards

Nitin P.