Distribution Process in Fund Management

Former Member
0 Kudos

I am using multi-level budget structuring. I have created a Hierarchy ID. In this hierarchy, with other fund centers, following fund centers are assigned

Fund Center 1.1 (Top node)

Fund Center 1.1.1 (Sub node of above)

I have marked Document Type for budget & release as "Roll up without Additive budget".

But system is not checking the budget in Top node (Fund Center 1.1), when i m assigning budget to Sub node (Fund Center 1.1.1) For example, Fund Center 1.1 is assigned budget of $ 100. Now system allows me to assign budget of $200 at sub node which should not happen in practical situation

Can somebody guide me how to resolve the problem. As after reading SAP library, I have done already done necessary configuration.

1 REPLY 1

Former Member
0 Kudos

thanks!