Quality information for production stages

former_member218067
Active Contributor
0 Kudos

Hi Friends,

I am new to Quality Module so please bear with me if the information is not proper the client requirement is

They need information/ notification or any trigger on each stage of production for a particular material, they don't want system to create inspection lot but just information

Is there any way we can achieve this?

Thanks

Diwakar

Accepted Solutions (1)

Accepted Solutions (1)

former_member587434
Active Contributor
0 Kudos

If they don't want to create inspection lot during this process then you can achive this kind of requirement throgh workflow event. SO based on requirement system will generate workflow email to concern person.

Hope this helps.

former_member218067
Active Contributor
0 Kudos

Hi,

Thanks for your reply.......

Yes work flow can be probable solution but how will tie it up with production order?

If the production order is confirmed for each stage can we create lot for each stage which can auto UD done with the help of some background program and then notification sent just as an info

Can we have some additional inputs on this?

Thanks

Diwakar

former_member587434
Active Contributor
0 Kudos

If you don't want to do inspection then why you want to create lot for each stage? instead of that check with WF person and check possiility to customize workflow event to trigger email at the time of production stage conformation.

If WF is not achivable this way then only go with inspection lot, but understand in your case you have to go with "03" tyep lot. Sysytem will not create different lot for each stage but in same lot you have to you will find different operation based on master data set up. As per my understanding "auto UD" is not possible for 03 type lot.

[http://help.sap.com/saphelp_erp60_sp/helpdata/en/04/926f8546f311d189470000e829fbbd/frameset.htm]

Edited by: Nehal Khamar on Aug 25, 2010 11:53 AM

former_member42743
Active Contributor
0 Kudos

Just as an FYI - QA40, QA41 and QA42 is used to set up an "Auto UD' for orders.

FF

former_member218067
Active Contributor
0 Kudos

Thanks for replies...

Now here is the exact scenario for Govt.orders we want to put a " Quality Lock " at each stage of production till the final

Unless each stage is approved by Quality the next operation should not start in the system

How can we configure this scenario? Please confirm

Thanks

Diwakar

former_member587434
Active Contributor
0 Kudos

Go to SPRO > Production> Shop floor control> operations > confirmation> define confirmation parameters

Maintain

1)Operation sequence u2013 error when operation sequence is not adhered to

2) Over delivery u2013 Error when over delivery tolerance is exceeded

3) Results Rec. (QM)- Error message if no Insp results exist

So what these setting helps is that

1)All operation has to be confirmed operation wise means 0010 has to be confirmed for confirming 0020 operation. SO production guys can only confirm 0040 operations only after 0030 operations is confirmed by quality personal.

2)Over delivery is not allowed means of in 0030 operation if only 50 quantity is confirmed in 0040 operation only 50 can be confirmed. Production people cannot confirm more than 50 quantities

3) Also PP personal cannot confirm operation 0030 through C011N till the result recording of that operation is done through QA32.

Hope this helps.

former_member218067
Active Contributor
0 Kudos

Thanks for the reply...

Can you please inform the steps for setting up this in Quality Management

Thanks

Diwakar

Former Member
0 Kudos

Hi

Do PP settings as per previous posts. For QM, activate inspection type 03 and 04 in material master.

For 03 type of inspection, you have to make routing in CA01. So when you release your production order, an inspection lot will be generated. This lot will not be stock relevant. This is just to check that you production is in accordance with quality norms. Only after clearing this lot from quality you can do your order confirmation, otherwise system will give hard error due to 3rd point of prev post.

For 04 type of inspections, prepare inspection plan in QP01. Now when order is confirmed, an inspection lot of 04 origin will be created in quality, and this is stock relevant and for final inspection of production order material.

If you need you can set for early inspection as well. That will give you another intermediate stage before final inspection. Inspection points are also an option if suites your requirement.

If you need more inspections, I suggest go for manual inspection lots of 04 origins, they are created in ref to order and are not stock relevant.

Answers (0)