Hi
I have created a route in config.
However it does not allow me to enter any information in the route stages. when I click on that the route stages screen comes but it is greyed out.
Is there another way of maintaining the route stages?
Thanks
Vinesh
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
ROUTE DETERMINATION
Step: 6 - Define Transportation Zone
Path: Sprou2014Logistics Executionu2014Transportationu2014Basic Transportation Function---Routesu2014Route Determinationu2014Define Transportation Zone.
Step: 7 - Maintain County and Transportation Zone for Shipping Point.
Path: Under the Same Menu path--- Maintain County and Transportation Zone for Shipping Point.
Select the Shipping point and enter the Country and Transportation Zone
Step: 8 - Define Transportation Groups.
Path: Under the Same Menu path---Define Transportation Groups
Step: 9 - Maintain Route Determination
Path: Under the Same Menu path--Maintain Route Determination.
Go to Customer master data.
In Address of General data. Enter the Transportation Zone id. and save
You will get the route.
The system takes into account the following 4 conditions for determining the Route u2013
a. The country and the Departure Zone of the shipping point +
b. Shipping Conditions agreed in the sales document type or with the sold to party +
c. Transportation Group assigned to the material +
d. The country & Transportation Zone of the ship to party (in CMR)
Route can be manually overwritten during a sales order processing. You can re-determine the route in the outbound delivery based on weight (weight group) provided it is allowed in the configuration of the delivery type.
Scheduling takes into account the following times u2013
a. Transit Time +
b. Loading Time +
c. Pick/Pack Time +
d. Transportation Lead/Planning Time.
The loading time and pick/pack time come from the shipping point whereas the transit time and transportation lead time come from the route.
The system performs backward scheduling first to confirm the required quantity checking the material availability on the material availability date. If the material availability date or the transportation planning date falls before the order date, the system automatically carries out forward scheduling and will propose a future date. A delivery type can be customized to carry out rescheduling if required during the delivery processing.
Regards,
Raj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
these are steps which can work as check point just check your config on each level
Route is determined automatically in the sales order based on:
1. Departure zone or country of the delivering plant.
2. Destination zone or country of the Ship to Party.
3. Shipping condition from the customer master.
4. Transportation group from the material master.
5. Weight Group.
Follow this:-
Step: 1 - Define Modes of Transport
Path: Sprou2014Logistics Executionu2014Transportationu2014Basic Transportation Function---Routesu2014Define Routesu2014Define Modes of Transport.
Step: 2 - Define Shipping Types
Path: Under the Same Menu path---Define Shipping Types
Select New Entries and Assign the Shipping Type (e.g. Road or Train) and Assign Mode of Transport (Mdtr) and Assign Shipping type Procedure group.
Step: 3 - Define Transportation Connection Point
Path: Under the Same Menu path--- Define Transportation Connection Point.
Step: 4 - Define Routes and Stages.
Path: Under the Same Menu path--- Define Routes and Stages.
Select the New Entries and Enter the Details
Then Select the Routes stages and define
Step: 5 - Maintain Stages for all Routes.
Path: Under the Same Menu path---Maintain Stages for all Routes.
-
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
this is to inform you that,
please check the config settings that you did for your route determination.
because it will automatically come at sales order level and
coming to your routes and stages if your config settings are correct then it will accept with green lights and your can proceed further with out any difficuilty.
regars,
balajia
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Please goto the links given below
http://www.sap-img.com/sap-sd/route-determination-in-sales-order.htm
I hope this will resolve your issue.
Thanks
Anil Hooda
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.