cancel
Showing results for 
Search instead for 
Did you mean: 

Shipment door should be released at loading end rather shipment completion.

Former Member
0 Kudos

Hi ,

There is a requirment from Business that " Door should be released at Loading end " instead of " shipment end "

is it possible for us to do this through Developement if so how ?

Loading end gets triggered when the last item on the TO is confirmed for the shipment and if we clear the door assignment on the loading end and in the meantime it another truck arrives at gatehouse, there is a possibility that the same door will be assigned to the truck even before the prior truck leaves the door

This is the major fear ,Could this be acived like ..

If so please suggest how this could be done ?

Awarded suitable points

Thanks

Adarsh

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member183879
Active Contributor
0 Kudos

Hi,

If we release the door during the Loading end status, this problem can occur. However inistead of loading end, if the door is released once the shipment status is "Shipment Start", I think it will work fine. At this point of time, anyway the truck also would have left the door and hence the door can be released to be made available for the next truck. There will not be any error in door allocation.