cancel
Showing results for 
Search instead for 
Did you mean: 

SP Level required for NW 7.0 Ehp1

Former Member
0 Kudos

Hi,

We are on SAPKB70017, KA -17 and system --> status showing ECC 6.0,

I heard that, if we apply SP stack 19 (Basis -19, abap -19, bw - 21 and PI basis patches ) system --> system will change from ECC 6.0 to SAP EHP 1

Ple clarify this

Regards,

Yash

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

The [Note 1248905 - SP Equivalence for update/upgrade to EHP 1 for SAP NW 7.0|https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1248905&nlang=E&smpsrv=https%3a%2f%2fwebsmp202%2esap-ag%2ede] gives a clear picture on the equivalance of SPS in NW 7.0 and NW 7.0 EhP1.

Hope this clarifies you.

Regards,

Varadharajan M

Former Member
0 Kudos

Hi,

thx for this info. this means even we apply SAPKB70022, system will be on NW 7.0 status only, right? as we dont want to go on Ehp1 as of now

Regards,

Yash

Former Member
0 Kudos

Hi,

The notes says that if ur system is SAP NetWeaver 2004 then SPS 22 is equivalent to EhP1 SPS 0.

Regards,

Varadharajan M

Former Member
0 Kudos

Hi,

"The notes says that if ur system is SAP NetWeaver 2004 then SPS 22 is equivalent to EhP1 SPS 0." but i think note says if you are planning to upgrade the system to Ehp1 then what should be the minimum target SP release.

My query resolved from that Note, thx!!!

Regards,

Yash

Answers (0)