on 08-17-2010 3:37 AM
Hi All -
We are linking batch characteristics to the MIC so that the results of inspection lot will populate batch characteristics. For example, client would like to see pH as batch characteristics therefore MIC of pH is liked to batch characteristics using class characteristics (pH).
However, i am unable to define sampling procedure when i link MIC with batch char. System by default creating a sample size equal to process order quantity.
Is there any way that i can define sample size when MIC is linked to batch char using class char. ?
Or please advice if any other way to populate batch characteristics with results of MIC.
Regards
S
In the MIC you set the control indicator for the sampling procedure. Once you set that, you can assign a sampling procedure in your inspection plans.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
however i believe it is not possible to assign sampling procedure for the MIC which are created using a class characteristic
Hi
It is very much possible. Just ctick the sampling tab in control indicator of reference MIC. In the inspection plan when you use this MIC, system promts for sampling procedure.