Dear sir

When iam doing the inprocess inspection during the production process , i found defective part /rowmaterial , then i have to replace the compnent / roamaterial .and also finished product.

in process inspection no stock posting ,how can i map in the sap for above said requriment.

Regards

Baswaraj

Accepted Solutions (1)

Accepted Solutions (1)

former_member42743
Active Contributor
0 Kudos

You don't via QM. Since you haven't actually made anything, (i.,e. no GR), there is no actual inventory.

You have to indicate the bad item vai your confirmations in PP. Not QM.

FF

Answers (1)

Answers (1)

Former Member
0 Kudos

Dear baswa raj ,

I believe you use inspection with lot origin 03. If yes then 03 is not stock relevant and hence you cannot post scrap through your inspection lot. The following options may be considered.

Option :- 1

1) Change the control key in the routing of the material to PP03

2) Activate inspection type 04

3) Create Quality plan for the materail

4) Inspection lots will be created where you may post scrap

Option :- 2

1) Have one operation in the routing as inspection with control key QM05

2) Restrict authorsiation for this operation to QM inspectors.

3) Post yeild and scrap in the order using confirmation (CO11N)

4) Create notification (Q3) to capture the defects.

Hope this is helpful.