on 08-12-2010 1:34 PM
Dear sir
When iam doing the inprocess inspection during the production process , i found defective part /rowmaterial , then i have to replace the compnent / roamaterial .and also finished product.
in process inspection no stock posting ,how can i map in the sap for above said requriment.
Regards
Baswaraj
You don't via QM. Since you haven't actually made anything, (i.,e. no GR), there is no actual inventory.
You have to indicate the bad item vai your confirmations in PP. Not QM.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear baswa raj ,
I believe you use inspection with lot origin 03. If yes then 03 is not stock relevant and hence you cannot post scrap through your inspection lot. The following options may be considered.
Option :- 1
1) Change the control key in the routing of the material to PP03
2) Activate inspection type 04
3) Create Quality plan for the materail
4) Inspection lots will be created where you may post scrap
Option :- 2
1) Have one operation in the routing as inspection with control key QM05
2) Restrict authorsiation for this operation to QM inspectors.
3) Post yeild and scrap in the order using confirmation (CO11N)
4) Create notification (Q3) to capture the defects.
Hope this is helpful.
Regards,
M.M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.