Hi Experts,
I have four interfacing system to SAP ERP via PI. The interfacing system will deposit individual file into a FTP folder.
All four files have the same file structure but with different timing. Will be using IDOC to integrate to ERP
System A deposits on a dailly basis
System B deposits on a monthly basis (end of month)
System C deposits on a weekly basis
System D deposits on 28th of the month.
Do I need to create four CS Configuration in Integration Builder for PI to poll at a different interval ?
Assuming the filename from the four systems will be the same. Or is there a better way to do this scenario ?
Best Regards
FNG
Do I need to create four CS Configuration in Integration Builder
Number of CS is irrelevant. It is number of channels you are creating whch could affect.
Assuming the filename from the four systems will be the same
Do you also have same directory? If yes, then just configure one channel and it will pick all the files.
Regards,
Prateek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
do u say all 4 systems will place file in ame FTP folder with same filename (at a different interval u mentioned)
if the file struct and IDoc is same. y don't u get ask them to place all the files to match the scheduling for the daily run so ur interface is the same and just picks the any number of files within the scheduled period
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.