material master and production versions changes can be combined in one chan

Former Member
0 Kudos

Hi,

We want to send the changes from material master and production version through the interface based on change pointer to the other system. I want to know whether we can send the changes witnin two different objects by using change pointer based Interface?

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Mark

is your material master and production version changes done together at same point of time ???

for e.g

1. if material master and production version changes done together then it is possible

2. if material master and production version changes will not done together then it's not possible

Thanks,

Jignesh Patel