on 07-22-2010 9:32 AM
can anybody tell me what is the wrong for me when i do 10 inspection type system not allowed the inspection point i also assigned inspection point in quality plan because hear i want to results 3 different results so thats why i assigned to 100 free inspection point kindly revert me back if any configuration is need
Are you sure you can use Inspection point for inspection type 10.As per my understanding its SAP default you can not use.
I may be wrong but I still to come across such scenario.
If you really want to do the multiple times RR then try to change the usage of the task list to that of Production & try to do.
Assign the production task list then check
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
ok i will check and revert back
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
if you want to do RR for three times you need to assign inpection point to inspection plan header of material.
you can create your own inspection point to use for this material, please see in SPRO for creating inpection point.
let me know if you need more than this.
best regards,
Nilesh I
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.