cancel
Showing results for 
Search instead for 
Did you mean: 

PR sequence number not match with the SO item line number

Former Member
0 Kudos

Hi All,

Can i have some advice on this PR sequence number doesn't match with the SO item line number.

Let me simulate how the problem causd:

We have a workflow defined when the SO material is non-stock, then it will trigger a PR automatically.

I Created a SO with 2 lines, first line is stock material, second is non-stock, because second line is a non-stock material, so a PR will be generate automatically.

In this case, the second line material is been assigned a sequence number "1" for PR.

But later on i change the first line to a non-stock material, which is been now assigned as PR sequence number "2".

Now my question is, before the SO is been save and PR been generate, is there a way that we can may the PR sequence number as the same as SO item line number?

Thank you very much,

Regards,

Chee Wee

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Closed without answer

Former Member
0 Kudos

HI ,

Can anyone advice me on this issue?

Thank you very much,

Regards,

Chee We

Former Member
0 Kudos

Hi Guru,

Need help please!

Former Member
0 Kudos

Hi All,

Can anyone please advice me? Is there any SAP note related to this.

Thank you very much,

Regards,

CheeWee