Cross Company Transport Order: from Proj. Stock to Proj. Stock NEEDED

Former Member
0 Kudos

Hi,

I think I have a serious problem.

I have two companies (A and B), same Controlling Area.

I have created project P with WBS element: P1.

I have created a transport Order for a material (from B to A).

The account assignment category for this material in the transport Order is Q.

In B, I REALLY NEED to treat this material in invidual stock for project P1. This is why in material master (MRP4) I should mantain Indidual/Coll: 1 (Individual Requiremnts).

I know SAP Standard doesn't allow this:

"If a material managed in project stock is to be procured from another plant using a cross-company-code stock transport order, the indicator must be set to 2 (collective requirements) in the issuing plant because, in this specific context, individual project stock management is not possible in both plants."

but still I really need to treat this material in an invidual way during the whole process.

So I need to send this material from project stock for P1 in B to project stock for P1 in A.

I know it is possible to transfer this material from project stock to unrestricted stock in B and then send it to A, but this would change the moving average price, and it wouldn't work.

How should I solve this problem?

Thanks in advance.

Luis.

Edited by: Virendra Pal on Jul 16, 2010 12:02 PM

Luis - Please do not jump the queue - next time I will lock the thread

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Maybe people didn't understand the question. I will rewrite it in a different way.