PPDS routings and dates

Former Member
0 Kudos

Hi.

Which dates does PPDS calculates ? Does PPDS calculate the scheduled dates or just the basic dates at opn and order level ?

Another question I have is regarding which opns are sent over to APO for scheduling. The onlline documentation says only the bottleneck opns need to be sent. In that case I would be effectively sending only a partial routing over. In that case APO will schedule these critical opns and not the others. Would these non critical opns then be scheduled on the ECC side ? Do I need to run MRP on the ECC side to obtain the scheduled dates for the non critical opns ?

Thanks

GS

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

For PPDS please find following useful notes:

OSS note : 441102 : Consulting notes in PP/DS

Oss note: 397989 : PPDS Scheduling (documentation).

Regards

Datta