on 06-29-2010 10:26 AM
for recurring inspection,job planning is done.Now we want to create the lots manually and not automatically.How to do it?
If you are not planing Recurring Inspection through QA05 then you can manually process through QA07
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yes with QA07 I can do it.But now QA05 is scheduled and I want to cancel that job planning.It should create lot automatically with job planning which is already scheduled.I want to avoid it and do it manually with QA07.
Also after removing QA05, for manual lot creation, if I will use QA01 instead of QA07, what will happen?
Edited by: sandip raut on Jun 30, 2010 7:40 AM
I suppose when you create the Manual lot (QA01)for the recurring it will loose all the checks like SLED or Shelf life expiration with reference to batch & storage location.
This lot will only be analysis purpose as you do not have stock posting.What i mean is you can not have history of the batch maintained.
As I understand better to go through QA07 only.
Hi,
Have you tried QA07 manual job planning.Just put their batch number ,plant run the programm.
I am not sure but I think it will work for you.
Regards
SANIl
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.