on 06-29-2010 7:31 AM
Hi,
I have a requirement to execute Rules-Based Location Substitution fallowed by a Multilevel Available To Promise (MATP) check at header level.
SO is created at the Depot level, and in case of unavailability of stock, the requirement need to flow to the factory and an MATP check should be carried out.
Present configuration.
Check Mode - Production Type with MATP
Check Instructions -
Product Check - First Step
Active RBA - Checked
Start Production - Availability check first, then produce
Compnts Remain. Reqmt - Create Remaining requirement at Header Level
Conversion Mode (ATPTreeStrct) - Create Several Planned orders
RBA - Made the basic setting and created the Location Substitution rule
Result
If SO is created at Depot - RBA runs the Location Substitution
If SO is created at Factory - MATP runs successfully creating missing part list and ATP tree structure.
Problem is I need to create SO at Depot then RBA runs the Location Substitution fallowed by
Edited by: manu gupta on Jun 29, 2010 8:31 AM
Thanks All,
Maintaining the 'Activity Control' in location substitution will solve the problem.
Regards
Manu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Manu,
Rule based gATP doesnot support this funtionality
It cannot do a mix of MATP & RBA.
Regards
Vaibhav
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
4 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.