on 06-25-2010 7:02 PM
Hello all,
We have a current project under way that requires WM configuration. In our ECC 6 system, IMG-> Logistics Execution -> WM, we are missing the Cross-docking node. Is this part of a EHP or should it exists "out the box"? Just FYI: This system was upgraded from a 46C system 2 years back. No EHP's have been installed to date.
Here's our current SP level on the system:
SAP_ABA 700 0021
SAP_BASIS 700 0021
PI_BASIS 2005_1_700 0021
ST-PI 2008_1_700 0001
SAP_BW 700 0023
SAP_AP 700 0019
SAP_APPL 600 0017
SAP_HR 600 0053
...
EA-IPPE 400 0017
EA-APPL 600 0017
EA-DFPS 600 0017
EA-FINSERV 600 0017
FINBASIS 600 0017
ECC-DIMP 600 0011
ERECRUIT 600 0011
FI-CA 600 0011
FI-CAX 600 0011
INSURANCE 600 0011
IS-CWM 600 0011
IS-H 600 0012
...
Regards,
Jose
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.