on 06-24-2010 10:30 AM
Hello all,
I would like to use a statistical project to link maintenance costs to a budget that is maintained in PS. The functionality is all there. i'm now trying to find a proper report.
Currently I'm doubting between 2 options:
Option 1:
CJ30: budgetting in object currency
CJE0: reporting in Controling area currency. Translate to certain currency.
Problem: This always leeds to conversion issues:
budgetted 10000 ---> report shows 9940.
actual cost: 9000 -
> report shows 8340
Option 2:
CJ40 for planning on costelement level
S_ALR_87013543 in object currency
Problem: CJ40 is planned in Controling area currency
What I want is the following:
CJ30 or CJ40 in object currency
Report in object currency where.
Does anybody have an idea how to handle this?
thanks in advance,
Peter
hi,
option 1:in budget profile maintain the budgeting currency as controllingarea currecny. in planning profile change the planning currency as controlling area currency with this you can avoid deviation in reports.
option 2: create report by copying standard hirechical report and change the report form keyfigure as object currency.
regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
NAG,
Thanks for your help. I have copied a standard hierarichal report and i'm now trying to add object currency as a key.
I have added the selection characteristic object currency in the characteristic tab, but that's not working. Ca you maybe gvie some more specific tips or if you have a certain link where i can find more details about configuration of a report?