Hi,
I have a scenario where in I am using LUMF as the item category in the material master for my header material and then I have maintained the Sales Bill Of Material for the same material. Let this header material be Mat 1. and the item materails be Mat 2 and Mat 3.
Once I use the same material in the sales order, then I have the Sold to party (let it be 101).The same is the Ship to party at the Header Level. Here my requirement is that when I come to Item level, Once I change the Ship to party for Header material i.e., Mat 1 to 102 then i want the same to be applied to the sub items i.e., Mat 2 and Mat 3.
Is there any standard way of doing this ? Please reply to me if I am missing any standard things and If I can achieve this through standard.
Thanks in Advance,
Rakesh Tummala.
If you change the SH at header level it applicable to all items SH will change. Its standard process. Please check
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.