on 06-23-2010 6:05 AM
Dear all
could you plz guide me how to create trail in sap for stability study
regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
i have idea to create test with material but not without material
how to assign plan to stab study if i m using stability study without material
one more thing i want to assign different characteristics for different storage condition is it possible if yes then how can i assign different plan to different condition or different inspection criteria to different storage condition
regards
how to assign plan to stab study if i m using stability study without material
You can create plan without material
one more thing i want to assign different characteristics for different storage condition is it possible if yes then how can i assign different plan to different condition or different inspection criteria to different storage condition
I hope you are aware of t code QST09 --->maintain building block for stability study
here for each storage condition enter the group & group counter for task list type Q.What you can do is create the different gr counter with same group.
When system asks for additional storage condition from QM02 , add your gr & gr ctr for new storage condition.
I hope you have explored enough to understand this.....!!!
thanks its work
would u plz tell me whats the use of making building blocks it would not work if i only make plan with diff groups for same material ????
also after scheduling lot will automatically created on call date or i have to manually release it????? any option to call it automatically on call date
would u plz tell me whats the use of making building blocks it would not work if i only make plan with diff groups for same material ????
yes.....Then you have to create different building blocks for different storage Condition.
So as you rightly said it will only work for single storage condition---->group combination.
Also after scheduling lot will automatically created on call date or i have to manually release it????? any option to call it automatically on call date
When you "start test schedule" the depending upon the cycle system will automatically create lot.You need not to create it manually.
If manually you want its only possible through 1601("manual creation of inspection lot for storage condition"
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.