on 06-22-2010 1:03 PM
Hi
My query is do we need to maintain any setting for SLED in QM? My requirement is I will put the SLED in UD, once SLED is reached, no consumption/stock posting will be done.
Thanks in advance!
Hi Sanil and Sujit,
Thanks!
So is it possible in SAP to stop lot generation if expiry date reached? And if there is no control on GR, then can we stop stock transfer in QA32? May be in batch config?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
So is it possible in SAP to stop lot generation if expiry date reached?
well that is what Recurring inspection is all about
And if there is no control on GR, then can we stop stock transfer in QA32?
I am not very sure what's your requirement is but in case of recurring GR comes into play only once whereas the stock posting will happen for multiple lots.Batch will be posted to Block stock after expiry date reaches.
Hi Swarnali,
basic setting u need to do are
In material master plant storage view enter Min. Rem. Shelf Life and Total shelf life, and in quality view enter inspection interval time (inspection lot will be created after these interval ) and activate inspection type 09.
at the time of gr system will ask for manufacturing date and shelf life date of that material. system will prompt error if shelf life is over
during ud u have to enter expiry date and save
material will be posted to unrestricted use
for example inspection interval= 10days then material will be automatically posted to block stock after 10 days.
inspection lot with inspection type 09 will be craeted.
u have to check expiry date and take ud accordingingly.
this cycle will carry on till the expiry date to material.
Related to SLED actually no setting is maintained ........what is maintained is the " Inspection lot interval" which helps in recurring.
This is only QM setting.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Even if you maintain SLED in UD.
You need to run QA05 where you can create varient to run daily .weekly as per ur requirement.
QA05 put plant.material ,batch itsdepend on ur requirement.
Their u have option to post stock at block when SLED get reached.
Maintain shelf life in material master also.
Regards
SANIL
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
86 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.