on 06-18-2010 7:03 AM
hi,
i already configured the inbound flow for Wm once gr-po the material is placed in destination bin. My requirement is now i have five materials in po if i put gr for the materials the stock should be placed in different bin (different material for different bin not in the single bin).what are all the settings i have to configure for the above scenorio.
Thanks
Muthuraman.D
Edited by: muthuraman d on Jun 18, 2010 11:33 AM
Hi,
please tell which put away strategy are you using? i believe you need to check this.
regards,
Anubhab
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi ,
i configure standard inbound flow in wm with source and destination bin as per my requirement. if i place any gr/po in migo for a material automatically stock moved to 00-01-01 series of bin. once the bin is full it moved to other bins.
now my requirement i created po which has five different types of material if i put gr for the material. a each material should be place in different bins(not in the single bin).
please kindly let me know the steps which i have to configure to achieve my requirement.
Regards
Muthu
User | Count |
---|---|
96 | |
10 | |
9 | |
6 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.