Dear Experts,

As per the Help note in the RA config settings step Activate Time Dependency for System Status

If you activate status evaluation by period, the R/3 System records the date on which you changed the status in a table.

You can overwrite the status change data manually online and, hence, backdate the change if required.

Could you kinldy advise, how can we change the release date of a project?

Thanking you.

Best Regards,

Abdul.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

By release, if you mean the EDIT-STATUS-RELEASE for WBS in CJ20N, then this date cannot be changed manually.

former_member230675
Active Contributor
0 Kudos

Hi,

Since SAP help says it is possible to change the status change date manually, I am looking for the way how to do it..?

Tnx.

Abdul

former_member203108
Active Contributor
0 Kudos

use CJC1 and enter by change mode.

Former Member
0 Kudos

Hi,

SAP Help does not specify that the dates in the system status can be set manually.

For the system status which is set in the WBS, the date cannot be changed manually.

former_member230675
Active Contributor
0 Kudos

Dear Ahmed,

Thank you very much for your valuable input.

It is working perfect..

Tnx.

abdul

former_member203108
Active Contributor
0 Kudos