on 06-08-2010 11:23 AM
Dear Experts,
How do i control creation of PDS because of operaion generated from planned delivery time,although planed delivery ime is zero.
the scenario is as follows:
Material :XXXXX
Planned Delivery time
Procurement Type:E
Plant:XXXX
in transaction /sapapo/curto_simu: there are two PDS displayed with PDS usage as PDS for Supply Network Planning(SNP)
the first one is because of operation generated fromm planned delivery time,output qty is the same a s that maintained as base qty in BOM and mode is blank,activity field is even blank.
the other PDS is created because of the valid production version in R/3.
Thanks in advance
Amrish
Hi Amrish,
Do you use routings ?
If yes, it may be possible to copy ruoting operating times to the planned delivery time fields .
Regards
Datta
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Dutta,
Thanx for a quick revert.
Yes we are using reciepe and we have a valid PDS being generated because of Production Version.
The problem lies with the creation of other PDS from planned delivery time whereinplanned delivery time is zero.I want a resolution so as the system doesnot create thses PDS which are invalid in nature.
These invalid PDS are hamperring result out of SNp optimizer for the reason these are considered in the input log of optimizer.
Regards,
Amrish