on 06-07-2010 11:21 AM
Hi Experts,
We have a batch job scheduled for deliveries, and sometimes it ends with a job failure with the below message" GETWA_TOO_MANY_SEGMENTS ".
I analysed the short dump and it occured to be due to the following reason.
The termination occurred in the function "get_segtab" of the SAP
Basis System, specifically in line 1228 of the module
"//bas/46D/src/krn/runt/abgetwa.c#21".
The internal operation just processed is "BRAX".
Additional Information:
The termination occurred in the ABAP/4 program "SAPMJ3AS " in
"J_3A_PROGRAM_LOAD".
The main program was "WS_MONITOR_OUTB_DEL_GDSI ".
The termination occurred in line 0
of the source code of program " " (when calling the editor 00).
The program "SAPMJ3AS " was started as a background job.
Can anyone let me know the root-cause of this issue and a way to get it resolved. May be by way of a SAP note.
Please advise,
Thanks
Beatle
Edited by: Beatle on Jun 7, 2010 12:30 PM
Go through note 526146
thanks
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
8 | |
7 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.