on 06-05-2010 5:22 AM
Hi Gurus,
For a Goods receipt for Production Order, Inspection lot was created, but the status of this lot is CRTD PASG SPRQ.
In the inspection specification of this lot, the inspection plan is assigned to inspection lot.But the sample size is 0 in this lot. When we click Sample icon in the tab Sample of this inspection lot, I get the information as "The sampling scheme INR is incomplete"
The sampling scheme INR is incomplete
Message no. QD092
Diagnosis
A sampling procedure was assigned to a characteristic in the inspection plan that references sampling scheme INR.
In this sampling scheme, no entry (that is, no sampling instruction) was found for the inspection severity 004, the AQL value 0.000 and for the lot size (for the population) 2604.
Keep in mind that the population is not necessarily the same as the lot size. The population is calculated from
the lot size
the conversion factor of the base unit of measure in the sample unit of measure
the factor of the sample unit
Example:
Base unit of measure is kg and the sample unit of measure is gr. The conversion factor is 1000. The factor of the sample unit is 5. As a result the individual sample is 5 grams.
If the lot size is, for example, 20 kg, then the population to which the sampling scheme is applied is 4000 (20 * 1000 / 5). If the calculated population exceeds the maximum allowed value of 10,000,000,000, the maximum value is used if it is entered in the "Lot size" column in the sampling scheme.
Procedure
Maintain sampling scheme INR.
Please help me to solve this issue.
Regards,
RP
Issue Solved
Edited by: R P on Jun 5, 2010 6:55 AM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.