on 05-28-2010 12:35 PM
Dear friends,
I want to create an inspection lot at the time of production order release (ideally - insp type 03). But I want to use inspection plan as a task list instead of routing for that lot.
Is it possible?
Best Regards,
Avinash
Hi
Why do you need QM inspection plan for insp. type 03?
Routing is to be done for 03 lots,. You can crete inspection plan for insp. type 04 when you do production order confirmation.Thats the integartion between PP-QM.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Swapnali,
Was expecting this re-question.
We are at a stage where system is already ready. The routing master data contains large number of alternatives and huge number of parallel sequences. We were looking for a solution in which we would make an inspection plan without touching routing master data. Second I want to create the lot at the time of order release (basically one lot per production order) so don't want to use insp type 04.
In config, I assigned task list type Q in front of lot origin 03 (Maintain Inspection Lot Origins and Assign Inspection Types).
But still system is picking the routing and not inspection plan. Is there a way out?
Regards,
Avinash