cancel
Showing results for 
Search instead for 
Did you mean: 

ECC 6.0 Integration with BI,CRM,SRM

Former Member
0 Kudos

Hi All,

What are the perequisites for Integration of ECC 6.0 with JAVA Stack (BI,CRM, SRM).

I suppose we can use PI as a middleware between ECC 6.0 and BI, CRM, SRM, But Please make understand the entire flow how we will achieve this and how it works physicaly.

And, What information ABAP and JAVA stack holds, How we can Install ABAP & JAVA Stack and what purpose it solves.

Please share your valuable inputs with me as I would like to have clear understanding of It.

Thanks in Advance,

VB

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

For any ABAP to/from Java integrations it is done via HTTP protocol. Basically, these are JCo connections from the JAVA system & HTTP based RFC's from the ABAP system.

There are delta differences in customizations for these products but the basic technology is still the same.

- Regards, Dibya

p330068
Active Contributor
0 Kudos

Hi Vikas,

Please have a look at http://help.sap.com/saphelp_ep50sp2/helpdata/en/89/6eb8deaf2f11d5993700508b6b8b11/content.htm

Hope it will helps

Regards

Arun