on 05-26-2010 5:03 PM
Are there any program for extending the Validity period for the Vehicle Resources in SCM?
The TPVS optimizer is giving the log as the resource is not valid with in the planning date.
Please advice if anyone came across similar issue.
Thanks,
Ramesh
Hi Ramesh,
Use the report /SAPAPO/CRES_CAPACITY_LENGTHEN.
You can schedule this report periodically to avoid
reoccurence of this error
Regards
R. Senthil Mareeswaran.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ramesh,
Did you check the above report & the settings.
Please confirm
Regards
R. Senthil Mareeswaran.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ramesh,
Please check the following:-
1) Inform your basis team to check the performance of both
livecache and optimiser server
2) If required run livecache consistency check
3) Check the volume of data used for the optimiser run, if
huge, reduce to minimum (split into various jobs) and run it
4) Check the application logs generated
Please confirm whether the above report was useful
to increase validity period of vehicle resource.
Regards
R. Senthil Mareeswaran
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
4 | |
3 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.