can we make SAP billing consider only the actual readings ?

Former Member
0 Kudos

Hi

We are billing water consumption in SAP IS-U. We are using serial switching to bill mutual consumption of the main device dividing it between the apartments in the building. When there are move-in/out or device replacements sometimes the billing can't be executed because SAP is estimating wrong readings for the intermediate time slices and the main device is accepting negative consumption, only for the intermediate consumption although the whole period between the actual readings is OK. If it happens we have to insert intermediate readings for all the devices in the building for each intermediate time slice.

Does anybody know a way to avoid this problem?

Can we make SAP billing consider only the actual readings without the proration, and remain with the serial switching?

Any help will be appreciated.

Thanks

Shosh

2 REPLIES 2

Former Member
0 Kudos

Hi

Check out your requirement with Dynamic Period Control Procedure.

We have DPC cookbook in service market place.

0 Kudos

Hi Narendar

Thank you,

We use Backbilling and Dynamic period control is IMPOSSIBLE to be used with Backbilling. Customizing does not allow you to use those functionalities together.So in our site DPC is not relevant to our problem .

Thanks