Central contract information from SRM to ECC

Hi everybody,

I´m working with an integrated landscape (SRM 7 with ECC 6), and i´m configuring the central contract, but i have a doubt about the information that is sent from SRM to ECC (the leading system about the contract is SRM). The contract description written in SRM is sent to the contract created in MM?????

Thanks for all.