Problem in quota arrangement

Former Member
0 Kudos

Hi All,

we have maintained 100% quota arrangment for location but system is not completly honouring quota seetings.

we have location P1 and P2 as supplying location and DC1 as dc where inbound quota of 100% from location P1 is maintained. After completion of heuristic we can see that most of the time preq is generated for the location P1(Where quota is maintained) but initial 2 pur req is coming from P2.

master data settings for these two locations are same...transportation time, means of transport etc all are same.

Does any one have faced similar issue? Kindly put down any pointer...

Thanks in advance

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi ,

Please check Quota valid from date and Transportation lane ( from P1 to DC1) valid from date.

Regards

Datta

Former Member
0 Kudos

There is no problem in validity date. planning is within it.

Former Member
0 Kudos

Hi,

Please check OSS note 1260960 u2013 SNP Heuristics Quota Arrangements with lot size if it is applicable.

Secondly , please check if removing quota data for P2 i.e. of 0% quota line in the quota master data , still creates any planned orders for location P2.

If even after removing line item for P2 from the quota master data, Planned orders are created, then please raise an OSS note.

If you are using subcontracting then there are some restrictions and please refer to OSS note 832393 .

We used to have maintaining version-dependent quota master data.

Regards

Datta

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Please check if quota arrangement is violated for the 1st time bucket only (this is not apparent from your statement), use sap note 1260323. We had faced the same issue while upgrading to SCM7.0.

regards,

biplab